This project involved the re-turfing of Front & Rear lawns at a newly constructed property on the Wentworth estate.
Using a tractor mounted cultivator, the site was prepared and then levelled with 80m3 high quality British standard screened topsoil.
Working with the irrigation specialist the site prep was completed and the fertiliser added before the turf was laid.
Supplying Rolawn Medallion Turf in the Turfmaster system to lay the turf enabling us to create a top quality lawn area. The Turfmaster roll (13m2) ensures fewer joints across the new lawn providing a faster establishment process.
An additional planting scheme was also produced and installed for the surrounding beds and hedging to complete a high quality garden and lawn area.